MODULES ARE NOT CONTAINERS

MODULES VERSUS CONTAINERS

Comparison of Climatic modular technology to other solutions - containers, parameters

Modular construction

modular construction - compliance with WT 2021

fire resistance of partitions REI 60-120, structures R 60-120

floor load capacity 500-1500 kg/m2

clear height of rooms from 3.0 to 3.7 m

sound insulation of external walls 50 to 63 dB

thermal insulation of partitions according to WT 2021

load bearing capacity of curtain wall 55 kg/m2

Containers

containers - non-compliance with WT 2021

fire resistance of partitions REI 30

floor load capacity up to 300 kg/m2

clear height of rooms 2.5 m

sound insulation of external walls 38 dB

thermal insulation of partitions below requirements

load bearing capacity of curtain wall 20 kg/m2

main differences

of modular construction

and container construction

/
/
/
/

Comparison of Climatic modular technology to other solutions - quality of workmanship

Modular construction

building accessible to disabled persons

possibility of installing equipment on the roof

corrosion protection of the structure

internal installations concealed in the wall thickness and ceiling zone

possibility of future superstructure up to 6 storeys (flexibility of use)

central supply/exhaust ventilation system with recuperation to ensure the number of air changes in accordance with WT 2021

multi-pitch roof possible

Containers

building not accessible to disabled persons

no roof-mounted installation possible

no multi-pitch roof possible

lack of corrosion resistance

internal installations cannot be hidden in the wall thickness and ceiling zone

no possibility of future superstructure

no solution for ventilation system = heat loss

main differences

of modular construction

and container construction

/
/
/
/

Comparison with container technology - application

Modular construction

permanent nature of the facility

hospitals, operating theatres, laboratories

public buildings

headquarters, police stations, stations

universities, schools, kindergartens, crèches

specialised buildings

office buildings

hotels

Data Centre

Containers

temporary nature of the facility

commercial pavilions

construction facilities

temporary housing for disaster victims or refugees

mobile barracks

temporary storage facilities

social room for workers

main differences

of modular construction

and container construction

/
/
/
/
Image

CERTIFICATES

Contact

Climatic Sp. z o.o. Sp. k.
Reguły, ul. Żytnia 6
05-816 Michałowice
NIP 522 26 56 057

+48 22 753 27 00
climatic@climatic.pl

Production Plant in Ostrowiec Świętokrzyski
20 Eugeniusza Kwiatkowskiego Street
27-400 Ostrowiec Świętokrzyski

tel: +48 22 753 27 00

unia1