Another hospital made of bricks. This time Gdynia!

Another hospital made of bricks. This time Gdynia!

Exactly a fortnight ago, a four-storey modular clinic building of approximately 486.39 m2 was constructed on the grounds of the University Centre for Maritime and Tropical Medicine in Gdynia (UCMMiT).

The site will be dedicated to the prevention, prevention and control of the SARS-CoV-2 virus.

The building will have a new emergency room on the ground floor and three floors with isolation rooms, registration and a swabbing room for coronavirus suspects. A connecting link, envisaged to provide positive test patients with direct communication between the emergency room and the lift complex located in the existing building.

This is another Climatic facility designed to combat the SARS-CoV-2 virus. Similar facilities already serve patients in Legnica or Bolesławiec.

2316843652139770374007185526197829066809673n-1030x773
2316729842139771274007092150003931195070101n-1030x773
2311471602139771107340441872373005022828211n-1030x773
230253852213977007400721874456336244163479n-1030x773
2313353142139770174007206986740657937932832n-1030x773

Pozostałe artykuły

Image

CERTIFICATES

Contact

Climatic Sp. z o.o. Sp. k.
Reguły, ul. Żytnia 6
05-816 Michałowice, POLAND
NIP 522 26 56 057

+48 22 753 27 00
climatic@climatic.pl

Production Plant in Ostrowiec Świętokrzyski
20 Eugeniusza Kwiatkowskiego Street
27-400 Ostrowiec Świętokrzyski, POLAND

tel: +48 22 753 27 00

unia1