Construction of a Pulmonology Ward at the John of God Hospital in Lublin

The scope of work for the project included: the creation of complete project documentation, obtaining the necessary approvals and permits, and the construction of a modular, two-storey building for the purposes of the hospital ward, connected to the existing building by a link, together with the associated infrastructure and landscaping.

The facility includes patient bed rooms, each with an entrance lock and sanitary facilities (16 double rooms and 2 quadruple rooms), a nursing station, technical rooms, sanitary rooms - for the disabled, utility rooms, storage rooms and a kitchen for patient needs.
Total area - 860.0 m2
Prefabrication - 15 modules
Implementation time - 5 months

szpital-im-jana-bozego-w-lublinie2
szpital-im-jana-bozego-w-lublinie1
szpital-im-jana-bozego-w-lublinie3
szpital-im-jana-bozego-w-lublinie7
szpital-im-jana-bozego-w-lublinie6
szpital-im-jana-bozego-w-lublinie5
szpital-im-jana-bozego-w-lublinie4

Pozostałe artykuły

Image

CERTIFICATES

Contact

Climatic Sp. z o.o. Sp. k.
Reguły, ul. Żytnia 6
05-816 Michałowice
NIP 522 26 56 057

+48 22 753 27 00
climatic@climatic.pl

Production Plant in Ostrowiec Świętokrzyski
20 Eugeniusza Kwiatkowskiego Street
27-400 Ostrowiec Świętokrzyski

tel: +48 22 753 27 00

unia1