New Modular Kindergarten in Wawer

New Modular Kindergarten in Wawer

New Modular Kindergarten in Warsaw-Wawer

Last Friday, a cornerstone-laying ceremony was held for the construction of a new kindergarten in the Wawer district of Warsaw. The event was attended by representatives of the Wawer District Office – including the Mayor – as well as representatives of the general contractor (Arcustechnologie) and the Climatic team, responsible for delivering the building in modular technology.

Only a few days after the ceremony, the entire kindergarten building is already being assembled on site. It is being constructed using advanced modular technology based on a steel structure – a solution that ensures full control over the construction process, precise assembly, and a significantly shortened delivery time.
The new facility will be a two-storey building with a total area exceeding 1,100 m² and a volume of over 4,000 m³. Thanks to our modular system, the installation of 22 modules will take just three days.

The designed kindergarten will include modern classrooms, a kitchen area, administrative rooms, a rhythmics hall, specialist offices, and a multifunctional space for activities and events.
With its rational functional layout and modern construction solutions, the building will be energy-efficient, safe, and welcoming for both children and staff.

As the partner responsible for the modular implementation, Climatic once again demonstrates that modern modular construction provides a real answer to the needs of rapidly developing urban districts.

📸 Photo gallery from the cornerstone-laying ceremony

37940
37933
37942
37945
37950
37960
37967
37969

Pozostałe artykuły

Image

CERTIFICATES

Contact

Climatic Sp. z o.o. Sp. k.
Reguły, ul. Żytnia 6
05-816 Michałowice, POLAND
NIP 522 26 56 057

+48 22 753 27 00
climatic@climatic.pl

Production Plant in Ostrowiec Świętokrzyski
20 Eugeniusza Kwiatkowskiego Street
27-400 Ostrowiec Świętokrzyski, POLAND

tel: +48 22 753 27 00

unia1