Polish Mother's Memorial Hospital Research Institute in Łódź

General construction works including the installation of ventilation and air conditioning (including the air recirculation system in the operating theatres), as part of the modernisation of the SP CSK operating theatre.

Renovation of the operating theatre in the Gynaecology and Obstetrics Hospital building (Building A, level 0, segments 5 and 8). Drawing up project documentation, construction and installation works, supply of medical equipment and apparatus.

iczmplodz

Pozostałe artykuły

Image

CERTIFICATES

Contact

Climatic Sp. z o.o. Sp. k.
Reguły, ul. Żytnia 6
05-816 Michałowice
NIP 522 26 56 057

+48 22 753 27 00
climatic@climatic.pl

Production Plant in Ostrowiec Świętokrzyski
20 Eugeniusza Kwiatkowskiego Street
27-400 Ostrowiec Świętokrzyski

tel: +48 22 753 27 00

unia1