Primary School No. 88 in Warsaw
Implementation in the ‘design and build’ mode of an investment project consisting in the expansion, superstructure and reconstruction of the building of Primary School No. 88 at 4B Radarowa Street, together with a gymnasium and associated infrastructure and landscaping.
The superstructure of the building in made in modular technology with a steel structure.
As a result of the extension and modernisation of the school on Radarowa Street, the facility gained over 2,800 square metres of new premises. The ground floor of the existing school building was extended. A large sports hall (32.2×17.4m), a gym, new changing rooms and sanitary facilities were also created. Meanwhile, the extension, on the top floor, created 14 modern classrooms and a staff room.
The superstructure of the building in made in modular technology with a steel structure.
As a result of the extension and modernisation of the school on Radarowa Street, the facility gained over 2,800 square metres of new premises. The ground floor of the existing school building was extended. A large sports hall (32.2×17.4m), a gym, new changing rooms and sanitary facilities were also created. Meanwhile, the extension, on the top floor, created 14 modern classrooms and a staff room.