SP ZOZ MSWiA in Opole
Climatic supplied and installed the modules constituting the superstructure of the SP ZOZ MSWiA hospital in Opole.
The project comprised the reconstruction of the hospital building and the superstructure of the 5th floor of the building for use as a modular operating theatre, together with the construction of the full medical infrastructure. The new floor of the hospital was equipped with medical equipment. The construction included 3 new operating theatres, storage rooms, a recovery room, a patient preparation room and technical rooms.A technical storey above the fourth floor of the hospital building was also built, together with the installations supplying the new Operating Theatre and the reconstruction of the building's gravitational ventilation.
Climatic supplied and installed 20 highly prefabricated modules, each weighing between 30 and 45 tonnes. The construction of the building superstructure was made possible by using modular construction technology.