Why modular building
Lead time more than 50% shorter
Start of prefabrication while still obtaining planning permission
High level of prefabrication - 90% of the construction and installation work is carried out at the prefabrication plant, on-site work consists only of sewing the modules and connecting the installation
Independence from weather conditions - prefabrication of the building on the hall allows uninterrupted operation independent of temperature or precipitation
Reducing the introduction of water and moisture into the building - use of drywall systems, no traditional screeds
Reduced weight of modular construction while maintaining strength parameters and self-supporting floor structure
Limit the size and cost of the foundation - point foundations are sufficient (footings/piles depending on the bearing capacity of the native soil)
No need to reinforce the existing building (or to reinforce it to a much lesser extent) in case of superstructure - modules are 5 times lighter than traditional buildings
Phasing of investments, alignment with the payment schedule