Modular Kindergarten in Wawer – Assembly

Modular Kindergarten in Wawer – Assembly

The investment in Warsaw’s Wawer district is approaching completion, and we are pleased to present a short video showcasing the steel-framed modular technology applied in this project. The solution ensured precision of execution, efficient assembly, and predictability of key construction stages – particularly important in educational developments.

The building, with a surface area of over 1,100 m², was created using 22 prefabricated modules. Their on-site assembly took just 3 days, confirming that a high level of prefabrication directly translates into construction speed and quality.

Transferring key construction stages to controlled factory conditions enables precise manufacturing and a high level of repeatability. Well-planned installation logistics ensure the smooth integration of all building components on site.

The new kindergarten in Wawer is a functional and energy-efficient educational space that meets contemporary technical and operational requirements. This project confirms that steel-framed modular construction is a mature technology that is increasingly setting new standards in public investments.

Watch the short video: https://youtu.be/XL7fgjU9rUk

Pozostałe artykuły

Image

CERTIFICATES

Contact

Climatic Sp. z o.o. Sp. k.
Reguły, ul. Żytnia 6
05-816 Michałowice, POLAND
NIP 522 26 56 057

+48 22 753 27 00
climatic@climatic.pl

Production Plant in Ostrowiec Świętokrzyski
20 Eugeniusza Kwiatkowskiego Street
27-400 Ostrowiec Świętokrzyski, POLAND

tel: +48 22 753 27 00

unia1