FOR EDUCATION

FOR EDUCATION

Modular construction finds its application in modular school buildings, kindergartens and nurseries. The modular system offers spacious and fully equipped rooms that meet the high functional requirements for educational spaces. The flexibility of the system allows for the free arrangement of new facilities, but also the expansion of existing facilities to suit the current needs of the user.

Expansion of the building, thanks to off-site production, can take place during holidays or during the school year without disrupting the operation of the unit. Modular schools and kindergartens, comply with all applicable standards and safety regulations.

Modular nurseries and crèches

Child-friendly and functional modular kindergartens are designed with sanitary, fire safety, acoustic and energy standards in mind. The use of our technology makes it possible to build a facility that provides a comfortable environment for all children in a short space of time.

By opting for a modular nursery or crèche, you can get a space that is child-friendly and adequate for the education or play of the little ones. Modular construction also means comfortable facilities from a staff and work perspective.

Modular school

Modular construction is ideal for school facilities. Modern modular technology ensures fast construction times. This is extremely important from the perspective of quickly providing places for children in educational facilities. At the same time, thanks to the superior quality of the prefabricated modules from which the buildings are constructed, all the standards for buildings intended for use by children are met

REFERENCE OBJECTS

Alt Text

Nursery and kindergarten complex, Kiełczów, Długołęka municipality

Basic information about the investment:

  • Area: 4 200 m2
  • Building volume: 17 900 m3
  • Number of storeys: 2
  • Number of modules: 57
  • Module assembly time: 10 days
  • Project implementation time: 10 months (design and construction)
Read more >>
Alt Text

Passive kindergarten ‘House around the tree’ in Podkowa Leśna

Basic information about the investment:

  • Area: 1 800 m2
  • Building volume: 7 900 m3
  • Number of storeys: 2
  • Number of modules: 44
  • Module assembly time: 6 days
  • Project implementation time: 13 months (design+build)
Read more >>
Alt Text

Primary School in Radwanice

Basic information about the investment:

  • Area: 3000 m2
  • Building volume: 9 900 m3
  • Number of storeys: 3
  • Number of modules: 61
  • Module assembly time: 9 days
  • Development lead time: 18 months (design and construction)
Read more >>
Image

CERTIFICATES

Contact

Climatic Sp. z o.o. Sp. k.
Reguły, ul. Żytnia 6
05-816 Michałowice
NIP 522 26 56 057

+48 22 753 27 00
climatic@climatic.pl

Production Plant in Ostrowiec Świętokrzyski
20 Eugeniusza Kwiatkowskiego Street
27-400 Ostrowiec Świętokrzyski

tel: +48 22 753 27 00

unia1