FOR HEALTH CARE

FOR HEALTH CARE

Modular construction works very well in medical facilities due to the low level of disruptive construction work. This is particularly important when there is a need to extend or super-structure facilities (such as hospitals, clinics, outpatient clinics, etc.) while maintaining the continuity of the existing parts of the building and minimising any inconvenience to both patients and staff.

A high degree of prefabrication of up to 90%, scalability and independence from weather conditions are features that significantly reduce investment time (by up to 50%), while meeting the highest standards set by building standards and technical requirements. At the same time, the specialised modular buildings are aesthetically pleasing (possibility to use any finishing materials both inside the building and on the façade or roofing) and adapted in appearance to their surroundings.

The specificity of modular technology allows for the effective and comprehensive realisation of the construction of hospital wards, operating theatres, emergency stations, laboratories, outpatient clinics, medical and treatment rooms, as well as hospital facilities such as warehouses, laundries and administrative and technical rooms.

ZEUS operating theatre integration system

Climatic's engineers have developed a combined device that combines state-of-the-art hardware and an intuitive application suite. The system integrates medical and non-medical equipment of the operating theatre and communicates with HIS,RIS/PACS systems.

REFERENCE OBJECTS

Alt Text

Regional Hospital in Sieradz

Basic information about the investment:

  • Area: 3 200 m2
  • Volume: 13 500 m3
  • Number of storeys: 2
  • Number of modules: 56
  • Module assembly time: 9 days
  • Investment implementation time: 11 months (implementation)

Read more >>
Alt Text

Nikolai Pirogow Regional Specialist Hospital in Łódź

Basic information about the investment:

  • Area: 2 500 m2
  • Cubic capacity: 9 700 m3
  • Number of storeys: 4
  • Number of modules: 31
  • Module assembly time: 11 days
  • Investment lead time: 12 months (implementation)

Read more >>
Image

CERTIFICATES

Contact

Climatic Sp. z o.o. Sp. k.
Reguły, ul. Żytnia 6
05-816 Michałowice
NIP 522 26 56 057

+48 22 753 27 00
climatic@climatic.pl

Production Plant in Ostrowiec Świętokrzyski
20 Eugeniusza Kwiatkowskiego Street
27-400 Ostrowiec Świętokrzyski

tel: +48 22 753 27 00

unia1