[row] [span12] [content_box custom_class=”wht_gray conr-rel”] real_1 [title_box title=”General contractor. An example of the comprehensive implementation of the investment project involving the design, financing and implementation.”] [row_in] [span6]

  • Oncology Center Construction
  • Stage I 170 million PLN
  • The entire  cost 313 million PLN
  • The work included the land use planning, along with the necessary infrastructure, construction of the Centre, supply of medical equipment and the training of hospital staff.
  • High-energy linear accelerators generate photon radiation 6 MV, 20mV with the beam visual system and carrier MLC

[/span6] [span6]

  • visualization system in therapeutic beam
  • 3D treatment planning system workstation for planning radiotherapy on the  accelerator
  • 3D dosimetry system
  • CT scanner with virtual simulation
  • fluoroscopy CT set
  • gamma camera with CT scan- SPECT / CT

[/span6] [/row_in] [/content_box]

[row_in]

[content_box custom_class=”wht_gray conr-rel”]

[span4]

[title_box title=”Regional Blood Donation and Blood Treatment Center in Hajnówka”]

Construction works on a new branch of Regional Blood Donation and Blood Treatment Center in Białystok – Regional Branch in Hajnówka. The investment included production, delivery and the assembly of completed and prefabricated modules equipped with all the necessary installations.

[/span4]

[span4]

[title_box title=”Städtisches
Klinikum Görlitz”]